Got some work on the bike. Here she sits waiting for the motor to be put back in. Everything is starting to come together. 10 days until the race and still a lot of work to do.
Here the transmission is disassembled. We converted the YZ transmission to the WR tranny. We decided to go with the WR 3,4, and 5th gear. 1st and 2nd are the same in the two motors.
Here we have one of the shafts assembled and ready for install in the bottom end.
with the transmission in the case we moved on to the crank. I forgot to take pictures of the assembled bottom end.